Installation of two bunker
lines on the loadout site

After the excavation for the bunker lines, the installation of the bunker lines was carried out as can be seen below.

The installation involves a more safe and efficient use of the mobilisation station, as bunkering of fuel and lifting of TPs to the vessel is done from the same mobilisation station at the Port of Esbjerg.

Note that since it should be possible to remove the pipes later on, the pipes are not welded but assembled.