Cases

View Case

Everfuels HySynergy PtX facility

Prefabrication and subsequent installation of piping and piping supports.

Read more
View Case

Repairing of the port of Hanstholm

Inspection of five concrete blocks on the side of the port showed that they did not lie against the pier head. Our analysis formed the basis of new, unique blocks.

Read more
View Case

Boskalis - Tyra jacket readiness scope

Getting access to the jacket constructions where the topsides already were removed

Read more
View Case

Crossbridge TA

In June 2021 SubC was awarded the mechanical scope of the planned Turnaround on @Crossbridge Energy Refinery in Fredericia.

Read more
View Case

Fatigue Reducing Liner

Ensuring a long lifetime for the caissons while reducing the need for new wedges. SubC designed a special epoxy compound.

Read more
View Case

Dump Caisson Inspection

The dump caisson was leaking. SubC was contacted to carry out an urgent inspection, and we had to go offshore within 2 days.

Read more
View Case

An innovative decommissioning operation

A revolutionised decommissioning method for cutting below seabed without personnel in the water

Read more
View

The Cracks in the Turbine Exhaust Supports Campaign

We decided to offer the most cost-effective, feasible solution: to complete the job within 14 days

Read more
View Case

Bearing Blocks Campaign

Fabrication and installation of 24 lifting points for Tyra. Responsible for the preparation including project management and engineering.

Read more
View Case

The Splash Zone Painting Campaign

We were met with challenging weather conditions but completed the job within the time frame despite the weather.

Read more
View Case

The Spider Deck Clean-Up Campaign

The objective for solving the project was to perform the work in the splash zone without personnel.

Read more
View Case

Boat landing - Offshore installation

SubC Partner successfully completed the boat landing installation and paint repair campaign on the Kraka field.

Read more
View Case

MGP rings - Marine Growth Prevention

SubC Partner successfully completed the marine growth prevention campaign on the Hejre field.

Read more
View Case

Modification of gangway

The aim was to modify the gangway so it could conduct landings at TP foundations when a vessel is jacked up.

Read more
View Case

Chemical Injection Module

The complete multidiscipline fabrication, assembly and testing of a two-deck structure with a protected environment.

Read more
View Case

Seabed survey and levelling

An urgent request to survey and level the seabed in preparation for the Dantysk accommodation platform.

Read more
View Case

Permanent gangways - Access systems

The gangway system is now designed for extreme wind conditions, a North Sea speciality.

Read more
View Case

Sea fastening of transition pieces

Delivering NDT report and necessary materials needed for port calls at the port of Esbjerg – on short notice.

Read more
View Case

JibFlex - moving and lifting

To use JibFlex with a special connection to the platform, for moving and lifting the Push-On unit - safe and easy.

Read more
View Case

Epoxy injection

The development of custom-made seals, epoxy mixture, injection techniques, equipment, offshore operation etc.

Read more
View Case

Field upgrade package - Fabrication and installation

The scope was to build and install two upgrade caissons, clamps, and all subsea Tie-in spools from the pipeline to caissons.

Read more
View Case

Replacement of buoyancy modules

The brief was to replace selected buoyancy modules on a live riser without shutting down oil production.

Read more