Field Upgrade Package - Fabrication Project

Customer
Technip UK/NO

Field & Location
TYRA/GORM/VALDEMAR/ROLF

Project completion date
1. September 2015

Contact:
Tonny Klein, Director & Partner, tonny@subcpartner.com, +45 2616 9277

Rune Værndal, Head of projects, Construction & Supply Service, Mail: rv@subcpartner.com, Phone: +45 2494 1443

SUBC WAS AWARDED THE COMPLETE SCOPE OF FABRICATION OF CAISSONS WITH INTERNAL RISER ARRAY FOR THE 2015 TYRA/VALDEMAR/ROAR/ROLF FIELD UPGRADE. THE PROJECT INCLUDED
ENGINEERING, TESTING AND TRANSPORT. FABRICATION OF COMPLETE SUBSEA TIE-INS FOR THE PROJECT WAS ALSO AWARDED FOR SUBSEQUENT DELIVER Y.

Scope of work

SubC Partner was awarded the contract by Technip in April 2013. The scope was to build two upgrade caissons, caisson clamps and all subsea Tie-in spools from pipeline to caissons. The delivery was for the Maersk Oil operated fields Valdemar and ROAR situated in the Danish part of the North Sea. 

SubC Partner delivered the first caisson clamps in the summer 2014 and was awarded the offshore installation campaign on both Roar & Valdemar by Maersk Oil. The campaign consisted of the complete offshore installation including chartering of the vessel Stril Challenger, project management, HSEQ & engineering, development of project specific welding procedures, welding, scaffolding, painting, 3D verification and NDE. 

The two caissons – each more than 60 meter and 70 tonnes – was build in less than 20 weeks and delivered almost simultaneously to take advantage of installation vessel in the most efficient way. The fabrication of the complex project required high-performance project management and planning ensuring that the construction was build in the correct and most effective sequence.

The Caisson risers were designed and build according to the DNV OS-F101 pipeline standard to ensure compliance with tie-ins and supersede topside requirements. SubC Partner have extensive xperience with this strict standard and delivered the project documentation with an unconditional release note from DNV.

Through our extensive knowledge of metallurgy and welding, we were able to comply with very high demands as set out in the design, while maintaining the cost level and deadline. The teamwork spirit and flexibility of SubC employees once again proved to be a winning formula.

All deliveries was done on time and without incidents, accidents or LTIs.

Added Value

• Reliability in delivery
• One stop shop for fabrication
• Extensive Multinational Procurement ability
• Supply Chain Focus
• Quality management of suppliers
• Industry leading Project Management
• High competences within metallurgy and welding engineering
• Flexibility

 

 

"I should say that I am really happy to work with your team at SubC Partner on this project. This package was DBUs project biggest and most critical package during which we had several challenges. I believe all these challenges are positive experiences for everyone in order to be more successful in next projects. 
Again, thank you very much for your cooperation, effort, and support and delivery for this important package. As I had already mentioned, and following the experiences we gained together, Technip will consider SubC Partner for future tenders and projects."

Kambiz Vasei
Project Procurement Lead
Supply Chain department

 